AI Construction Cost Calculator
Calculate house construction cost for any city
Select your state and city, enter area, floor structure, rooms, bathrooms, kitchens and finishing scope to estimate construction budget, BOQ, materials and timeline.
Banking Finance Assistance
Need construction loan or staged finance?
After estimating house construction cost, check EMI, loan eligibility and banker assistance for construction finance.
PWD/SOR + Price Today Construction Calculator
Estimate full project cost from basement to high-rise tower
Calculate house, apartment, commercial and multi-storied project cost up to 75 floors with basement, schedule mode and Price Today market rate guidance.
Estimated Project Budget
₹17,68,680
Effective Rate / Sq.ft
₹1,769
Budget Range
₹16,21,800 - ₹21,13,440
Project type
Low-rise
Total area
1,000 sq.ft
Levels
1 above ground
High-rise factor
x1.00
Schedule factor
x1.02
Project Cost Breakup
PWD / DPR Schedule Summary
Government-style estimate breakup
This uses the new PWD SOR foundation engine with building, sanitary and electrical schedule logic. Final official estimate still needs engineer-approved measurements and exact item-code mapping.
DPR Grand Total
₹14,65,632
Schedule Subtotal
₹11,94,289
GST
₹2,14,972
Labour Cess
₹14,093
Contingency
₹42,278
RCC structural work
BLDG-RCC-INDICATIVE
Brickwork / blockwork
BLDG-BRICKWORK-INDICATIVE
GI pipe 15 mm exposed medium
SAN-GI-PIPE-15-EXPOSED-2017
DWC HDPE SN8 drainage pipe 150 mm
SAN-DWC-HDPE-SN8-150-2017
Fixing ceiling fan
ELEC-FIX-CEILING-FAN-2017
SPN MCB distribution board
ELEC-SPN-MCBDB-2017
Electrical wiring point
ELEC-WIRING-POINT-INDICATIVE
Price Today material intelligence
Verify cement, TMT, sand, brick and aggregate rates before final BOQ, RFQ or contractor negotiation.
AI Material Quantity Estimate
Approximate materials for your construction
Based on 1000 sq.ft, 1 floor, standard grade.
Approximate cement requirement for RCC, masonry and plastering.
Approximate steel requirement. Final quantity depends on structural design.
Approximate sand quantity for concrete, masonry and plastering.
Approximate aggregate requirement for RCC and concrete work.
Approximate walling material. Depends on wall thickness and design.
Approximate tile area excluding wastage variation.
Approximate electrical point estimate for residential planning.
Approximate plumbing point estimate for kitchen and bathroom usage.
- • This is an indicative material estimate for early planning only.
- • Final quantity depends on architectural plan, structural design, soil condition, wall thickness and site wastage.
- • TMT steel quantity must be finalized by a structural engineer.
AI Drawing Intelligence
Upload drawing for preliminary BOQ intelligence
Upload a PDF, image, DWG or DXF drawing. The current version gives safe preliminary quantity-surveyor guidance. Exact CAD/PDF extraction will be connected later.
AI Confidence
84%
- • Structural materials should be requested first.
- • Electrical and plumbing RFQs should be prepared before plastering.
- • Finishing materials can be finalized later based on budget and design.
- • AI drawing analysis currently uses engineering heuristics.
- • Future versions will support PDF and AutoCAD extraction.
- • Lift estimation activates automatically for high-rise structures.
- • Parking area estimation increases for multi-storey buildings.
AI BOQ Preview
Preliminary bill of quantities
Generated for 1000 sq.ft, 1 floor, 3 rooms, 2 bathrooms and standard grade.
- • This BOQ is an early-stage AI/rule-based estimate for planning only.
- • Final BOQ must be prepared from architectural and structural drawings.
- • Foundation, RCC and steel quantities must be checked by an engineer.
- • Electrical and plumbing BOQ should be finalized from room-wise point layout.
AI Construction Timeline
Estimated project completion timeline
Based on 1000 sq.ft, 1 floor, 3 rooms, 2 bathrooms and standard grade.
Note: Delay may occur if drawings, land layout or approvals are not ready.
Note: Soil condition and water level can strongly affect duration.
Note: RCC duration depends on floor count, shuttering, curing and labour availability.
Note: Wall layout and material availability can affect speed.
Note: Room-wise point clarity is important before plastering.
Note: Weather and curing time may affect completion.
Note: Tile size, design and availability can affect duration.
Note: Custom fabrication may increase duration.
Note: Moisture and weather can delay paint finishing.
Note: Depends on availability of fittings, fixtures and final vendor coordination.
Note: Snag list quality determines final handover speed.
- • This is an indicative construction timeline estimate for early planning.
- • Actual duration depends on labour availability, weather, material delivery, cash flow, site access and contractor coordination.
- • RCC and foundation phases may vary significantly based on structural design and curing requirements.
- • Premium finishing and interior work may increase project duration.
AI Procurement Phase Scheduler
Convert construction timeline into procurement triggers
Automatically plan when to trigger materials, services, rentals and inspection RFQs.
RFQ: Engineer and site supervision service
Note: Planning delay affects every later construction phase.
RFQ: Foundation cement sand aggregate TMT supply
Note: Foundation cannot proceed without timely material delivery.
RFQ: Foundation excavation contractor
Note: Soil condition and machine availability can delay foundation work.
RFQ: RCC cement TMT aggregate supply
Note: RCC work is highly schedule-sensitive due to shuttering and curing cycles.
RFQ: Shuttering and concrete equipment rental
Note: Rental availability should be confirmed before RCC work starts.
RFQ: Brick or block supply
Note: Brick quality, delivery and unloading should be confirmed in advance.
RFQ: Masonry labour contractor
Note: Mason availability controls wall completion speed.
RFQ: Electrical and plumbing rough-in work
Note: Rough-in must be completed before plastering.
RFQ: Plaster cement and sand supply
Note: Material moisture and sand quality affect plaster finish.
RFQ: Floor tiles and flooring material supply
Note: Tile design selection can delay finishing if not finalized early.
RFQ: Door window grill supply and fitting
Note: Fabrication items need longer lead time.
RFQ: Paint putty primer supply
Note: Paint work depends on surface dryness and final shade selection.
RFQ: Final finishing fittings and hardware supply
Note: Finishing items often delay handover if selected late.
RFQ: Final inspection and snag correction
Note: Snag correction should be completed before handover.
- • This procurement schedule is generated from the AI construction timeline estimate.
- • Trigger dates indicate when RFQ/vendor coordination should ideally begin.
- • Actual procurement dates may change due to vendor availability, material stock, transport, payment timing and weather.
- • Critical triggers should be handled before phase start to avoid work stoppage.
AI Auto RFQ Generator
Convert this construction plan into RFQs
AI can split your construction plan into materials, services and rental RFQ packages for vendor discovery.
Save AI Construction Plan
Save this project to your dashboard
Store this construction estimate, BOQ, material plan, timeline and procurement-ready project profile in your 3bigha dashboard.
