3bigha.com AI-powered property construction materials and vendor marketplace logo
Post / List
🔔 AlertsAccount
Select Language
Browse
Account
Browse verified listings • Compare quotes • Contact vendors • Track enquiries
3bigha.com is an AI-powered property marketplace, construction marketplace, RFQ procurement platform, materials marketplace, rental marketplace and vendor discovery platform serving India with regional language support, AI procurement workflows, vendor comparison and local marketplace search.

AI Construction Cost Calculator

Calculate house construction cost for any city

Select your state and city, enter area, floor structure, rooms, bathrooms, kitchens and finishing scope to estimate construction budget, BOQ, materials and timeline.

Banking Finance Assistance

Need construction loan or staged finance?

After estimating house construction cost, check EMI, loan eligibility and banker assistance for construction finance.

PWD/SOR + Price Today Construction Calculator

Estimate full project cost from basement to high-rise tower

Calculate house, apartment, commercial and multi-storied project cost up to 75 floors with basement, schedule mode and Price Today market rate guidance.

Check Price Today →
Government schedule note: exact PWD/SOR or CPWD/DSR costing requires the official schedule PDF/Excel and item-code mapping. Until that file is uploaded, this calculator uses schedule-guided multipliers plus local Price Today market intelligence.
Price Today Dynamic
Adjust estimate with 3Bigha Price Today material market movement.

Estimated Project Budget

₹17,68,680

Effective Rate / Sq.ft

₹1,769

Budget Range

₹16,21,800 - ₹21,13,440

Project type

Low-rise

Total area

1,000 sq.ft

Levels

1 above ground

High-rise factor

x1.00

Schedule factor

x1.02

Project Cost Breakup

Materials₹10,25,834
Labour₹3,89,110
Finishing₹2,12,242
Contractor Margin₹88,434
Miscellaneous₹53,060

PWD / DPR Schedule Summary

Government-style estimate breakup

This uses the new PWD SOR foundation engine with building, sanitary and electrical schedule logic. Final official estimate still needs engineer-approved measurements and exact item-code mapping.

DPR Grand Total

₹14,65,632

Schedule Subtotal

₹11,94,289

GST

₹2,14,972

Labour Cess

₹14,093

Contingency

₹42,278

PWD Item
Qty
Base Rate
Live Rate
Adj.

RCC structural work

BLDG-RCC-INDICATIVE

85 cum
₹9,520
₹9,520
+12%

Brickwork / blockwork

BLDG-BRICKWORK-INDICATIVE

55 cum
₹6,572
₹6,572
+6%

GI pipe 15 mm exposed medium

SAN-GI-PIPE-15-EXPOSED-2017

18 metre
₹205
₹205
+7%

DWC HDPE SN8 drainage pipe 150 mm

SAN-DWC-HDPE-SN8-150-2017

12 metre
₹449
₹449
+7%

Fixing ceiling fan

ELEC-FIX-CEILING-FAN-2017

3 each
₹235
₹235
+0%

SPN MCB distribution board

ELEC-SPN-MCBDB-2017

1 each
₹1,305
₹1,305
+0%

Electrical wiring point

ELEC-WIRING-POINT-INDICATIVE

12 point
₹1,045
₹1,045
+0%
PWD source logic added from uploaded WB PWD Building, Sanitary and Electrical SOR files. Base rates are now compared with Price Today market-adjusted rates where material intelligence is available.

Price Today material intelligence

Verify cement, TMT, sand, brick and aggregate rates before final BOQ, RFQ or contractor negotiation.

Open Price Today

AI Material Quantity Estimate

Approximate materials for your construction

Based on 1000 sq.ft, 1 floor, standard grade.

Cement
500 bags

Approximate cement requirement for RCC, masonry and plastering.

TMT Steel
4,800 kg

Approximate steel requirement. Final quantity depends on structural design.

Sand
1,800 cft

Approximate sand quantity for concrete, masonry and plastering.

Stone Chips
1,250 cft

Approximate aggregate requirement for RCC and concrete work.

Bricks / Blocks
8,500 pcs

Approximate walling material. Depends on wall thickness and design.

Floor Tiles
900 sq.ft

Approximate tile area excluding wastage variation.

Electrical Points
18 points

Approximate electrical point estimate for residential planning.

Plumbing Points
8 points

Approximate plumbing point estimate for kitchen and bathroom usage.

Important assumption
  • This is an indicative material estimate for early planning only.
  • Final quantity depends on architectural plan, structural design, soil condition, wall thickness and site wastage.
  • TMT steel quantity must be finalized by a structural engineer.

AI Drawing Intelligence

Upload drawing for preliminary BOQ intelligence

Upload a PDF, image, DWG or DXF drawing. The current version gives safe preliminary quantity-surveyor guidance. Exact CAD/PDF extraction will be connected later.

AI Confidence

84%

AI Detection Legend
Bedroom
Bathroom
Kitchen
Staircase
Lift Core
Parking
AI OCR Insights
Drawing extraction visibility
0% confidence
Extracted OCR Text
No OCR text extracted yet.
Detected Engineering Labels
No engineering labels detected yet.
Drawing → BOQ Action
Generate BOQ from drawing intelligence
Uses detected rooms, bathrooms, kitchens and floor count to prepare an RFQ-ready BOQ package.
AI Procurement Package
Drawing-based vendor package planning
Converts drawing intelligence into material groups, vendor categories and RFQ-ready procurement packages.
6 RFQ-ready groups
Cement & Concrete Package
Cement / RMC / Aggregate Supplier
high
CementSandStone ChipsRMC / Concrete
Core structural procurement for approx 1,000 sq.ft construction.
TMT Steel & RCC Package
TMT Steel / Reinforcement Supplier
high
TMT BarBinding WireRCC Labour Support
High-priority package because RCC and steel affect structure, cost and schedule.
Brick / Block Masonry Package
Brick / Block Supplier
medium
BricksAAC BlocksMortar Materials
Room layout indicates approx 4 room zones requiring walling materials.
Sanitary & Plumbing Package
Plumbing / Sanitary Vendor
medium
CPVC/PVC PipesFittingsSanitarywareWater Tank
Detected/estimated 2 bathroom zones and 1 kitchen zone(s).
Electrical Package
Electrical Contractor / Material Supplier
medium
WiresSwitchesDB BoxMCBConduits
Electrical points can be estimated from room count and final layout.
Flooring & Finishing Package
Tiles / Paint / Finishing Vendor
low
Floor TilesWall TilesPaintPuttyPrimer
Finishing procurement should follow civil progress and room-wise layout finalization.
Procurement Execution Timeline
What to buy first, next and later
Converts drawing and BOQ intelligence into a simple execution order for contractors, builders and procurement teams.
Readiness
95%
Ready for RFQ
Procurement Health & Delay Forecast
52%
High Risk
90%
delay risk
19
possible slip days
Immediately lock critical materials, vendor delivery dates and backup suppliers.
Critical Path
2
stages can affect full site schedule
Blocked Stages
4
stages control next work packages
Site Stoppage Risk
1
high-risk procurement stage
Step 1Start first
Structural Procurement
high
Foundation, RCC, column, beam and slab work
CementTMT SteelSandStone Chips
Best time: Before excavation / foundation
Depends on: Can start first
Blocks: masonry, plumbing, electrical, finishing
Procurement progress weight: 35%
Critical path signal: High priority. Delay here can affect multiple next stages.
Step 2After RCC base
Masonry Procurement
medium
Walling begins after structural base and slab progress
BricksBlocksCementSand
Best time: After structure reaches working level
Depends on: structure
Blocks: plumbing, electrical, finishing
Procurement progress weight: 25%
Critical path signal: High priority. Delay here can affect multiple next stages.
Step 3Before plaster
Plumbing Procurement
medium
Must start before plaster and bathroom finishing
PipesFittingsSanitary linesWater tank
Best time: Before internal plaster
Depends on: masonry
Blocks: finishing
Procurement progress weight: 15%
Critical path signal: Medium priority. Keep vendor and material confirmation ready.
Step 4Before plaster
Electrical Procurement
medium
Concealed wiring must happen before plaster
WiresConduitsSwitch boxesDB box
Best time: Before plaster and putty
Depends on: masonry
Blocks: finishing
Procurement progress weight: 15%
Critical path signal: Medium priority. Keep vendor and material confirmation ready.
Step 5After civil completion
Finishing Procurement
low
Should follow wet work and layout finalization
TilesPaintPuttyPrimer
Best time: After plaster curing
Depends on: plumbing, electrical
Blocks: No next stage blocked
Procurement progress weight: 10%
Critical path signal: Low blocking risk. Can be handled after earlier work is stable.
AI Procurement Notes
  • Structural materials should be requested first.
  • Electrical and plumbing RFQs should be prepared before plastering.
  • Finishing materials can be finalized later based on budget and design.
Procurement Execution Engine
RFQ, vendor matching, material arrival and risk guidance
Create RFQ for cement, TMT steel, sand and stone chips
Start immediatelyCement / TMT / Sand / Aggregate Supplier
Critical path
Ready for RFQ and vendor matching
Arrival plan: Material should reach site before work starts. Confirm stock, unloading and transport early.
Risk warning: Delay here can stop site work and increase labour idle cost.
Delay impact: Delay here can push the whole construction schedule. Site stoppage risk: high
Create RFQ for bricks, blocks and masonry materials
After Structural ProcurementBrick / Block / Masonry Material Supplier
Critical path
Ready for RFQ and vendor matching
Arrival plan: Material can be planned after previous civil progress is confirmed.
Risk warning: Delay may affect finishing speed, but can be controlled with early vendor confirmation.
Delay impact: Delay here can push the whole construction schedule. Site stoppage risk: medium
Create RFQ for pipes, fittings, sanitary lines and water tank
After Masonry ProcurementPlumbing / Sanitary Vendor
Ready for RFQ and vendor matching
Arrival plan: Material can be planned after previous civil progress is confirmed.
Risk warning: Delay may affect finishing speed, but can be controlled with early vendor confirmation.
Delay impact: Delay here may affect the next local activity only. Site stoppage risk: medium
Create RFQ for wires, conduits, DB box and electrical points
After Plumbing ProcurementElectrical Contractor / Material Supplier
Ready for RFQ and vendor matching
Arrival plan: Material can be planned after previous civil progress is confirmed.
Risk warning: Delay may affect finishing speed, but can be controlled with early vendor confirmation.
Delay impact: Delay here may affect the next local activity only. Site stoppage risk: medium
Create RFQ for tiles, paint, putty, primer and finishing items
After Electrical ProcurementTiles / Paint / Finishing Vendor
Ready for RFQ and vendor matching
Arrival plan: Material can be planned after previous civil progress is confirmed.
Risk warning: Delay may affect finishing speed, but can be controlled with early vendor confirmation.
Delay impact: Delay here may affect the next local activity only. Site stoppage risk: low
Autonomous Procurement Actions
Next actions for site manager, contractor and procurement team
Confirm vendor for Cement / TMT / Sand / Aggregate Supplier
Owner: Procurement team
high
Call vendor, confirm stock, rate validity, delivery date and unloading support.
Prepare backup supplier for Cement / TMT / Sand / Aggregate Supplier
Owner: Site manager
critical
Keep second vendor ready before work starts to avoid labour idle time.
Confirm vendor for Brick / Block / Masonry Material Supplier
Owner: Procurement team
high
Call vendor, confirm stock, rate validity, delivery date and unloading support.
Estimated Rooms
4
Bathrooms
2
Lift Count
0
Wall Length
1900 rft
AI Detection Status
Preliminary quantity-surveyor extraction active
84% confidence
Drawing Type
Floor Plan
Procurement Ready
Yes
BOQ Intelligence
Active
RFQ Automation
Ready
Balcony Area
80 sq.ft
Parking Area
60 sq.ft
Engineering Notes
  • AI drawing analysis currently uses engineering heuristics.
  • Future versions will support PDF and AutoCAD extraction.
  • Lift estimation activates automatically for high-rise structures.
  • Parking area estimation increases for multi-storey buildings.

AI BOQ Preview

Preliminary bill of quantities

Generated for 1000 sq.ft, 1 floor, 3 rooms, 2 bathrooms and standard grade.

Foundation excavation
Earth excavation for foundation and footing preparation.
650
cft
Earthwork Contractor
Actual quantity depends on soil condition and foundation depth.
RCC work
RCC column, beam, slab and staircase work.
PWD-BLDG-RCC-BASE
380
cft
RCC Contractor
Final RCC quantity must be verified from structural drawings.
PWD Section: RCC
Price Today: cement, tmt, sand, aggregate
Brick/block masonry
Wall masonry using brick or block.
1,350
sq.ft
Masonry Contractor
Depends on wall thickness and internal partition layout.
Internal and external plaster
Wall and ceiling plaster work.
PWD-BLDG-PLASTER-BASE
2,800
sq.ft
Plaster Contractor
Includes approximate internal and external plaster surface.
PWD Section: Plaster
Price Today: cement, sand
Floor tile work
Floor tile laying with adhesive/mortar and finishing.
PWD-BLDG-FLOORING-BASE
950
sq.ft
Tile Contractor
Add wastage depending on tile size and layout.
PWD Section: Flooring
Price Today: tiles, cement, sand
Painting work
Wall putty, primer and paint work.
PWD-BLDG-PAINTING-BASE
2,900
sq.ft
Painting Contractor
Depends on number of coats and paint brand.
PWD Section: Painting
Price Today: paint, primer, putty
Electrical wiring
Wiring, switch points, light/fan points and DB setup.
PWD-ELEC-WIRING-POINT-2017
18
points
Electrical Contractor
Point count should be finalized from room layout.
PWD Section: Electrical
Price Today: wire, switch, mcb, conduit
Plumbing work
Bathroom, kitchen and water supply/drainage points.
PWD-SAN-PLUMBING-POINT-2017
8
points
Plumbing Contractor
Depends on number of bathrooms, kitchen and water tank layout.
PWD Section: Sanitary & Plumbing
Price Today: pipe, cpvc, gi pipe, sanitary
Doors and windows
Main door, internal doors, windows and ventilators.
PWD-BLDG-DOOR-WINDOW-BASE
12
sets
Door & Window Vendor
Depends on room count, design and material type.
PWD Section: Doors & Windows
Price Today: door, window, aluminium, glass
Site miscellaneous work
Scaffolding, curing, cleaning, minor tools and site support.
1
lot
General Contractor
Indicative lot-based estimate for early planning.
BOQ assumptions
  • This BOQ is an early-stage AI/rule-based estimate for planning only.
  • Final BOQ must be prepared from architectural and structural drawings.
  • Foundation, RCC and steel quantities must be checked by an engineer.
  • Electrical and plumbing BOQ should be finalized from room-wise point layout.

AI Construction Timeline

Estimated project completion timeline

Based on 1000 sq.ft, 1 floor, 3 rooms, 2 bathrooms and standard grade.

Total Duration
25 weeks
approx 169 days
1. Planning & Site Preparation
Drawing review, site clearing, layout marking and basic preparation.
Dependency: Project start
7 daysmedium risk
Vendor: Engineer / Site Supervisor
Note: Delay may occur if drawings, land layout or approvals are not ready.
2. Foundation Work
Excavation, footing, foundation concreting and initial curing.
Dependency: After planning and layout marking
17 dayshigh risk
Vendor: Foundation Contractor
Note: Soil condition and water level can strongly affect duration.
3. RCC Structure
Column, beam, slab, staircase and RCC curing cycle.
Dependency: After foundation completion
28 dayshigh risk
Vendor: RCC Contractor
Note: RCC duration depends on floor count, shuttering, curing and labour availability.
4. Brickwork / Blockwork
External walls, internal partition walls and masonry work.
Dependency: After RCC frame readiness
19 daysmedium risk
Vendor: Masonry Contractor
Note: Wall layout and material availability can affect speed.
5. Electrical & Plumbing Rough-in
Concealed wiring, pipe routing, bathroom and kitchen line preparation.
Dependency: After brickwork layout completion
14 daysmedium risk
Vendor: Electrical / Plumbing Contractor
Note: Room-wise point clarity is important before plastering.
6. Plaster Work
Internal and external plaster work with curing.
Dependency: After electrical and plumbing rough-in
20 daysmedium risk
Vendor: Plaster Contractor
Note: Weather and curing time may affect completion.
7. Flooring / Tile Work
Floor tile laying, bathroom wall tiles and finishing alignment.
Dependency: After plaster curing and surface preparation
16 daysmedium risk
Vendor: Tile Contractor
Note: Tile size, design and availability can affect duration.
8. Doors & Windows
Door frame, shutter, window and grill installation.
Dependency: After masonry and plaster readiness
11 daysmedium risk
Vendor: Door & Window Vendor
Note: Custom fabrication may increase duration.
9. Painting
Wall putty, primer, internal paint and external paint.
Dependency: After plaster drying and surface preparation
19 daysmedium risk
Vendor: Painting Contractor
Note: Moisture and weather can delay paint finishing.
10. Final Finishing
Sanitary fitting, electrical fixture, final hardware and cleaning.
Dependency: After flooring, painting and fixture readiness
13 daysmedium risk
Vendor: Finishing Contractor
Note: Depends on availability of fittings, fixtures and final vendor coordination.
11. Inspection & Handover
Final checking, snag correction and handover preparation.
Dependency: After final finishing
5 dayslow risk
Vendor: Site Supervisor
Note: Snag list quality determines final handover speed.
Timeline assumptions
  • This is an indicative construction timeline estimate for early planning.
  • Actual duration depends on labour availability, weather, material delivery, cash flow, site access and contractor coordination.
  • RCC and foundation phases may vary significantly based on structural design and curing requirements.
  • Premium finishing and interior work may increase project duration.

AI Procurement Phase Scheduler

Convert construction timeline into procurement triggers

Automatically plan when to trigger materials, services, rentals and inspection RFQs.

Project Start
2026-05-28
Estimated Completion
2026-11-13
Procurement Triggers
14
Finalize drawings and site supervision
Confirm engineer, site supervisor, layout marking and project execution plan.
Trigger on 2026-05-21 • Phase starts 2026-05-28
highservices
Vendor: Engineer / Site Supervisor
RFQ: Engineer and site supervision service
Note: Planning delay affects every later construction phase.
Procure cement, sand, aggregate and TMT for foundation
Arrange core construction materials before foundation concreting begins.
Trigger on 2026-05-29 • Phase starts 2026-06-04
criticalmaterials
Vendor: Building Material Supplier
RFQ: Foundation cement sand aggregate TMT supply
Note: Foundation cannot proceed without timely material delivery.
Book excavation contractor
Arrange excavation team or machine before foundation layout starts.
Trigger on 2026-05-30 • Phase starts 2026-06-04
highservices
Vendor: Earthwork Contractor
RFQ: Foundation excavation contractor
Note: Soil condition and machine availability can delay foundation work.
Procure RCC cement, TMT, chips and shuttering support
Prepare RCC material supply and shuttering support before slab/beam/column work.
Trigger on 2026-06-13 • Phase starts 2026-06-21
criticalmaterials
Vendor: RCC Material Supplier
RFQ: RCC cement TMT aggregate supply
Note: RCC work is highly schedule-sensitive due to shuttering and curing cycles.
Arrange shuttering and concrete equipment
Book shuttering material, mixer, vibrator or lifting support if required.
Trigger on 2026-06-14 • Phase starts 2026-06-21
highrentals
Vendor: Construction Equipment Rental
RFQ: Shuttering and concrete equipment rental
Note: Rental availability should be confirmed before RCC work starts.
Procure bricks or blocks
Arrange brick/block supply before masonry team starts wall work.
Trigger on 2026-07-14 • Phase starts 2026-07-19
highmaterials
Vendor: Brick / Block Supplier
RFQ: Brick or block supply
Note: Brick quality, delivery and unloading should be confirmed in advance.
Confirm masonry labour
Book mason team for wall masonry and partition work.
Trigger on 2026-07-15 • Phase starts 2026-07-19
mediumservices
Vendor: Masonry Contractor
RFQ: Masonry labour contractor
Note: Mason availability controls wall completion speed.
Finalize electrical and plumbing rough-in contractors
Confirm concealed wiring, pipe routing, bathroom and kitchen line contractors.
Trigger on 2026-08-01 • Phase starts 2026-08-07
highservices
Vendor: Electrical / Plumbing Contractor
RFQ: Electrical and plumbing rough-in work
Note: Rough-in must be completed before plastering.
Procure plaster materials
Arrange cement, sand and related plaster materials before plaster team starts.
Trigger on 2026-08-17 • Phase starts 2026-08-21
mediummaterials
Vendor: Building Material Supplier
RFQ: Plaster cement and sand supply
Note: Material moisture and sand quality affect plaster finish.
Procure tiles and flooring materials
Finalize tile design, quantity, adhesive and grout before flooring starts.
Trigger on 2026-08-31 • Phase starts 2026-09-10
highmaterials
Vendor: Tile Supplier
RFQ: Floor tiles and flooring material supply
Note: Tile design selection can delay finishing if not finalized early.
Order doors, windows and grills
Finalize measurements, material type and fabrication vendor before installation phase.
Trigger on 2026-09-12 • Phase starts 2026-09-26
highmaterials
Vendor: Door / Window Vendor
RFQ: Door window grill supply and fitting
Note: Fabrication items need longer lead time.
Procure paint, putty and primer
Select paint brand, finish and quantity before surface preparation starts.
Trigger on 2026-10-02 • Phase starts 2026-10-07
mediummaterials
Vendor: Paint Supplier
RFQ: Paint putty primer supply
Note: Paint work depends on surface dryness and final shade selection.
Procure sanitary, electrical fittings and hardware
Arrange final bathroom fittings, switches, lights, locks, handles and accessories.
Trigger on 2026-10-14 • Phase starts 2026-10-26
highmaterials
Vendor: Finishing Material Supplier
RFQ: Final finishing fittings and hardware supply
Note: Finishing items often delay handover if selected late.
Prepare final inspection and snag list
Check finishing, leakage, electrical points, paint defects and pending correction items.
Trigger on 2026-11-05 • Phase starts 2026-11-08
mediumservices
Vendor: Site Supervisor
RFQ: Final inspection and snag correction
Note: Snag correction should be completed before handover.
Procurement assumptions
  • This procurement schedule is generated from the AI construction timeline estimate.
  • Trigger dates indicate when RFQ/vendor coordination should ideally begin.
  • Actual procurement dates may change due to vendor availability, material stock, transport, payment timing and weather.
  • Critical triggers should be handled before phase start to avoid work stoppage.

AI Auto RFQ Generator

Convert this construction plan into RFQs

AI can split your construction plan into materials, services and rental RFQ packages for vendor discovery.

Construction materials supply RFQ
materialscritical priority
Cement bags — approx 500 bags
TMT steel rod — approx 4800 kg
Construction sand — approx 1800 cft
Stone chips / aggregate — approx 1250 cft
Create RFQ
Construction labour and service RFQ
serviceshigh priority
Foundation excavation work — approx 650 cft
RCC casting work — approx 380 cft
Brick masonry work — approx 1350 sq.ft
Wall plaster work — approx 2800 sq.ft
Create RFQ
Construction equipment rental RFQ
rentalshigh priority
Shuttering and concrete equipment rental — approx 28 days
Create RFQ
This panel currently prepares RFQ-ready packages. Direct database RFQ creation is handled through the safe API layer and can be connected after final user confirmation.

Save AI Construction Plan

Save this project to your dashboard

Store this construction estimate, BOQ, material plan, timeline and procurement-ready project profile in your 3bigha dashboard.